Wednesday, November 30, 2005


a ceiling beam with "v-groove" for hidden wiring. Posted by Picasa

cutting parts for the kitchen beams (notice all the nice notches!). Posted by Picasa

the heat mat installed.  Posted by Picasa

the heat mat sits rolled up in the shower. Posted by Picasa

finished with the shower tile (on the left), Mike prepares the floor for the heat mat. Posted by Picasa

Sunday, November 27, 2005


more floor, almost done. Posted by Picasa

a new floor in the den. Posted by Picasa

the kitchen ceiling restrapped and ready for sheetrock. Posted by Picasa

Saturday, November 26, 2005


Raleigh watches from a safe distance. Posted by Picasa

The doors and windows are finally in. Posted by Picasa

Cutting more frames. Posted by Picasa

Dave replaces the rotten sill under the window-to-be. Posted by Picasa

I level the doors on the inside. Posted by Picasa

Dennis and Josh help with the doors. Posted by Picasa

Saturday, November 05, 2005


Samantha's finished front door in handsome blue. Posted by Picasa

Samantha's first coat of blue paint on the back door. Posted by Picasa

the same frame, showing the new flooring extending out onto the sill.  Posted by Picasa

the header and jacks for the frame for our new doors in the living room. (note new doors and giant pile of debris just outside). Posted by Picasa